Go Back   FormKaos: Board > Music Discussion > Simply Music
FAQ Community Arcade Today's Posts Search

Simply Music All genres, hot artists, track ID and general discussion

Reply
 
LinkBack Topic Tools Rate Topic
  #1 (permalink)  
Old Sep 22, 05
I gets down, rip sound.
 
Join Date: Feb 2002
Jarman is on a distinguished road
Tipper: The Critical Path

I'm talking about the 11 rack cd that he put out around 2000...anyone got it? know where to find it?
Reply With Quote
  #2 (permalink)  
Old Sep 22, 05
Living in the NOW
 
Join Date: Apr 2001
Bobby_T is an unknown quantity at this point
Sick,sick album.
Reply With Quote
  #3 (permalink)  
Old Sep 24, 05
I gets down, rip sound.
 
Join Date: Feb 2002
Jarman is on a distinguished road
hmmmmm......sick (as in virulent) responses....guess we're about the only one 'in the know'..........
Reply With Quote
  #4 (permalink)  
Old Sep 24, 05
Registered User
 
Join Date: Sep 2001
matéo is a jewel in the roughmatéo is a jewel in the roughmatéo is a jewel in the roughmatéo is a jewel in the rough
definately opened me up to a new sound after I heard this album.
Reply With Quote
  #5 (permalink)  
Old Sep 24, 05
I gets down, rip sound.
 
Join Date: Feb 2002
Jarman is on a distinguished road
word up man.....same for me. I had a very intense mushroom trip within that cd. some of the best composed music I've ever heard, and the reason Tipper's been my favorite DJ since 2001. Smoking the massive joint he rolled for during his IDM set on the beach at shambles was fucking prime.
hey, what's your msn, mateo?
add me: [email protected]
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Forum Jump


All times are GMT -7. The time now is 04:30 PM.


Forum software by vBulletin
Circa 2000 FNK.CA